Lift day at the Fox Road Bridge replacement designed by Bassett Engineering for Tunkhannock Township! The existing 96-foot two-span steel I-beam bridge is being replaced with a 106-foot single-span prestressed concrete bulb-tee bridge. The new bridge will offer significant geometric, hydraulic, and safety improvements. This project is funded by both PennDOT and DCED Multimodal Transportation Fund grants. Susquehanna Valley Construction Corporation is constructing the bridge for the project. Check out the timelapse video and the pictures of the beams being set below!