Lift Day
Lift Day photos of a brand new 16’ span precast concrete arch structure, set on Valley Road, Susquehanna Township. This bridge is part of the Lycoming County Bridge Bundling Program: Bundle 2. The concrete arch structure, designed by Bassett Engineering, was over 72’ long and consisted of nine concrete arch sections, five wingwall pieces, and two precast headwalls. Valley Road is expected to be open to traffic within the week. Wolyniec Construction successfully installed the arch sections along with the headwall and wingwall sections.