Wet Well Rehab Improvements for WMA

Washingtonville Municipal Authority Wet Well

Completed: 2017

Bassett Engineering worked closely with the Washingtonville Municipal Authority to design improvements to the Authority’s Wetwell at the Wastewater Sewage Treatment Plant.

The improvements included: the installation of a new pump, new control wiring elevated above the high water level, the addition of the ultrasonic level transducer, lining of the well, installation of a new hoist and ladder, and structural improvements to the platform including aluminum grating and supports.

Additionally, the electrical junction box was replaced, the inside walls of the wet well were painted, and adjustments were made to bypass pumping around the wet well to complete the improvements.

 

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.