Bassett Engineering

  • Home
  • Company
    • About Us
    • Awards
  • Civil
    • Funding Assistance
    • Bridges and Culverts
    • Roads
    • Buildings and Land Development
    • Dams and Stream Bank Restoration
    • Surveying
  • Environmental
    • Water
    • Wastewater
    • Nutrient Removal
    • Leachate
    • Permitting
    • Renewable Energy/Waste To Energy
  • Bids
  • Careers
  • Contact

Project Complete: Lewis Township Wastewater Treatment Plant

October 29, 2024 By Britt Bassett

Lewis Township started its upgraded Wastewater Treatment Plant this spring. This substantial upgrade to the old plant utilizes the Virginia Initiative Plant (VIP) with Step Feed process. The VIP provides biological phosphorus and total nitrogen removal without chemicals. Step feed has already proven invaluable to treat significance peak flows.

Stay up to date on our projects by following our Facebook or LinkedIn Pages.

Filed Under: Bassett Engineering News Tagged With: Bassett, Engineering, Updates

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.