Bassett Engineering

  • Home
  • Company
    • About Us
    • Awards
  • Civil
    • Funding Assistance
    • Bridges and Culverts
    • Roads
    • Buildings and Land Development
    • Dams and Stream Bank Restoration
    • Surveying
  • Environmental
    • Water
    • Wastewater
    • Nutrient Removal
    • Leachate
    • Permitting
    • Renewable Energy/Waste To Energy
  • Bids
  • Careers
  • Contact

Completed Project: Caleb’s Creek Road

November 4, 2021 By Joey Worth

Bassett Engineering is excited to announce the completion of the second bridge replacement under the Lycoming County Bridge Bundling Program. This aluminum box culvert which spans 19‘’ is located on Caleb Creek Road in Eldred Township. This bridge was supplied by Contech Engineered Solutions and was installed by Wolyniec Construction of Williamsport, PA. This is the second of the four bridges in Bundle 1 to be completed, and Bundle 1 is expected to be completed in the fall of 2021.

Filed Under: Bassett Engineering News

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.