Construction Update: LRBSA Clinton Secondary Clarifier Improvements

April 18, 2025 By Britt Bassett

Over the last couple weeks, activity has really ramped up on site for the Secondary Clarifier Improvements project at LRBSA’s Clinton WWTP. The Milnes Co. and Everon Electrical are moving full speed ahead on this plant upgrade with Bassett Engineering supervising construction of our design.

This marks the first of multiple updates we’ll be sharing as construction progresses – from large precast tank construction to equipment installations and much more.

With a full slate of construction across wastewater, bridges, and beyond, 2025 is shaping up to be a busy year for BE!

Stay up to date on our projects by following our Facebook or LinkedIn Pages.

Filed Under: Bassett Engineering News Tagged With: Bassett, Engineering, Updates

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.