Bassett Engineering

  • Home
  • Company
    • About Us
    • Awards
  • Civil
    • Funding Assistance
    • Bridges and Culverts
    • Roads
    • Buildings and Land Development
    • Dams and Stream Bank Restoration
    • Surveying
  • Environmental
    • Water
    • Wastewater
    • Nutrient Removal
    • Leachate
    • Permitting
    • Renewable Energy/Waste To Energy
  • Bids
  • Careers
  • Contact

Project Update: Bordell Road Bridge

December 4, 2025 By Britt Bassett

We are happy to share this behind the scenes look at the precision and teamwork driving this project forward. On 11/14/2025, our team set five 48” x 24” Concrete Adjacent Box Beams into place using an Allison crane. Each beam plays a critical role in forming the substructure of the new GRS-type bridge.

Stay up to date on our projects by following our Facebook or LinkedIn Pages.

Filed Under: Bassett Engineering News Tagged With: AllisonCrane, Bassett, Bridges, Engineering, Updates

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.