Completed Project

March 22, 2024 By Britt Bassett

Lake Road Bridge is a 32-foot span by 36-foot long by 12-foot-high precast concrete arch with precast footers on Lake Road over Elk Creek. The new road segment and bridge are a full two lanes wide with shoulders. The road was realigned to eliminate a slight double curve and regraded to smoothly transition to the hill grade past the bridge. The four bridge corners at the wingwalls were stabilized with riprap, and new guiderail and signs were set. 

Stay up to date on our projects by following our Facebook or LinkedIn Pages.

Filed Under: Bassett Engineering News Tagged With: Bassett, Engineering, Updates

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.