Bassett Engineering

  • Home
  • Company
    • About Us
    • Awards
  • Civil
    • Funding Assistance
    • Bridges and Culverts
    • Roads
    • Buildings and Land Development
    • Dams and Stream Bank Restoration
    • Surveying
  • Environmental
    • Water
    • Wastewater
    • Nutrient Removal
    • Leachate
    • Permitting
    • Renewable Energy/Waste To Energy
  • Bids
  • Careers
  • Contact

Construction Continues: Lewis Wastewater Treatment Plant

January 12, 2024 By Britt Bassett

Construction continues on the Lewis Wastewater Treatment Plant! A closer look shows Dutchland setting the precast concrete panels to construct the wastewater treatment plant. They have since been gasketed, grouted, and passed the watertight integrity test. 

Stay up to date on our projects by following our Facebook or LinkedIn Pages.

Filed Under: Bassett Engineering News Tagged With: Wastewater

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.