Photo of the day: MSE Walls set at Upper Bodines Road January 25, 2018 By Bassett Engineering Crews hard at work installing the MSE walls at Upper Bodines Road Bridge. There is a lot of activity at the job site so check back often for updates.
Photo of the day: Preparing for MSE Walls at Upper Bodines Road January 22, 2018 By Bassett Engineering The crew at Upper Bodines Road prepare for the MSE (Mechanically Stabilized Earth) walls that are set to arrive on Thursday, January 25, 2018. Check back often for updates!
Photo of the day: Arches set at Upper Bodines Road December 18, 2017 By Bassett Engineering Check out these massive cranes that were used to set the bridge arches on Thursday December 14th at Upper Bodines Road.
Photo of the day: No bridge at Upper Bodines Road December 12, 2017 By Bassett Engineering Check back Friday, December 15th for updates