Lycoming County Bridge Bundling: Bundle 2
Bill Sones Road, Moreland Township
Bassett Engineering is excited to announce the completion of the fifth and final bridge under Bundle 2 of the Lycoming County Bridge Bundling Program!
The brand-new concrete arch spans 32′ and is 33′ long and is located on Bill Sones Road in Moreland Township. A precast arch was chosen for Bill Sones Road due to stream and site requirements.
The stream crossing has been improved by increasing the hydraulic opening and capacity, providing armor against erosion along upstream and downstream embankments, and reducing scour at the outlet by lowering stream velocities through the structure. The structure was sized to carry a full two-lane roadway.
The structure was designed by Bassett Engineering of Montoursville, prepurchased by Lycoming County through the PA COSTARS Program, and the installation was completed by Wolyniec Construction of Williamsport, PA. The bridge was completed in October of 2022.
Check out another bridge from Bundle 2