Lycoming County Bridge Bundle: Bundle 2
Valley Road, Susquehanna Township
Bassett Engineering is excited to announce the completion of the third bridge under Bundle 2 of the Lycoming County Bridge Bundling Program! The brand-new concrete arch spans 16′ and 72′ long and is located on Valley Road in Susquehanna Township. A precast arch was chosen for Valley Road due to stream and site requirements. The stream crossing has been improved by increasing the hydraulic opening and capacity, providing armor against erosion along upstream and downstream embankments, and reducing scour at the outlet by lowering stream velocities through the structure. The structure was designed by Bassett Engineering of Montoursville, prepurchased by Lycoming County through the PA COSTARS Program, and the installation was completed by Wolyniec Construction of Williamsport, PA. The bridge was completed in July of 2022.
Check out another completed bridge from Bundle 2.