Bassett Engineering

  • Home
  • Company
    • About Us
    • Awards
  • Civil
    • Funding Assistance
    • Bridges and Culverts
    • Roads
    • Buildings and Land Development
    • Dams and Stream Bank Restoration
    • Surveying
  • Environmental
    • Water
    • Wastewater
    • Nutrient Removal
    • Leachate
    • Permitting
    • Renewable Energy/Waste To Energy
  • Bids
  • Careers
  • Contact
You are here: Home / Archives for Bassett Engineering News

President’s Blog February 20, 2018

February 20, 2018 By Bassett Engineering

We would like to say congratulations to Pitt’s American Society of Civil Engineers (ASCE) student chapter for their accomplishments.  Our very own Connor Bassett serves as the Vice President for the chapter and is pictured in the article.

Filed Under: Bassett Engineering News Tagged With: Blog, President, Student

Photos of the day: Progress at Upper Bodines Bridge

February 16, 2018 By Bassett Engineering

Upper Bodines Road, Lewis Township, Lycoming CountyUpper Bodines Road, Lewis Township, Lycoming County

 

 

 

 

 

 

It’s been a busy week and a half at the project site.  The contractor, Rylind Construction, placed shale fill on both advance approaches beyond the bridge MSE wall limits.  This fill is subbase for the future approach roadway.  They placed geogrid and stone backfill behind the MSE walls, removed the Jersey Barrier from the stream, placed rip-rap at all 4 corners of the bridge and restored the stream channel under the bridge.

 

Upper Bodines Road, Lewis Township, Lycoming CountyUpper Bodines Road, Lewis Township, Lycoming County

Filed Under: Bassett Engineering News Tagged With: Lewis Township, Lycoming County, Rylind Construction, Upper Bodines Road

Photo of the day: Backfill continues at Upper Bodines Road

February 6, 2018 By Bassett Engineering

Work is moving forward at the Upper Bodines Road site.  Crews have been busy backfilling both the north and south ends of the bridge and adding more weatherproofing.  Upper Bodines Road, Lewis Township, Lycoming County, Bassett Engineering

Filed Under: Bassett Engineering News Tagged With: Backfill, Bridge, Upper Bodines Road

Photo of the day: Backfill started at Upper Bodines Road

February 1, 2018 By Bassett Engineering

Crews are continuing to make progress at the bridge site. This week they started the backfill process.  Here you can see the stone and the geogrid, which is used for reinforcement.  This process will be continued on both the north and south ends of the bridge.  Stay tuned for more exciting updates!Upper Bodines Road, Lewis Township, Lycoming County

Filed Under: Bassett Engineering News Tagged With: Backfill, Bridge, Upper Bodines Road

Photo of the day: MSE Wingwalls set at Upper Bodines Road

January 26, 2018 By Bassett Engineering

Upper Bodines Road, Lewis Township, Lycoming CountyUpper Bodines Road, Lewis Township, Lycoming CountyConstruction continues to move forward at Upper Bodines Road.  The MSE wingwalls were set and everyday the bridge is looking more and more like the finished product.  Hard to imagine that only a few weeks ago this site was just a big empty hole.  Keep following us for more updates!

Filed Under: Bassett Engineering News Tagged With: MSE, Updates, Upper Bodines Bridge, Upper Bodines Road, Wingwalls

Photo of the day: MSE Walls set at Upper Bodines Road

January 25, 2018 By Bassett Engineering

Upper Bodines Road Bridge, Lewis Township, Lycoming County, Bassett Engineering Upper Bodines Road, Lewis Township, Lycoming County, Bassett EngineeringCrews hard at work installing the MSE walls at Upper Bodines Road Bridge.

There is a lot of activity at the job site so check back often for updates.

Filed Under: Bassett Engineering News Tagged With: Updates, Upper Bodines Bridge, Upper Bodines Road

Photo of the day: Preparing for MSE Walls at Upper Bodines Road

January 22, 2018 By Bassett Engineering

Upper Bodines Road, Bridge, Lewis Township, Lycoming County

The crew at Upper Bodines Road prepare for the MSE (Mechanically Stabilized Earth) walls that are set to arrive on Thursday, January 25, 2018.

Check back often for updates!

Filed Under: Bassett Engineering News Tagged With: MSE, Updates, Upper Bodines Bridge, Upper Bodines Road, Walls

Photo of the day: Renovo Borough Ontario Avenue

January 19, 2018 By Bassett Engineering

Our project in Renovo Borough consisted of reconstructing Ontario Avenue from 4th St to 8th St and mill and overlay from 8th St to 11th St.  Pictured are the concrete sidewalks, curb ramps and curb at the 4th St intersection of Ontario Ave looking east.  Renovo Borough, Ontario Avenue

 

Filed Under: Bassett Engineering News Tagged With: Curbs, Ontario Avenue, Ramps, Renovo Borough, Sidewalks

Photo of the day: Shuck Road Culvert Replacement

January 15, 2018 By Bassett Engineering

Shuck Road, Lewis Township, Culvert ReplacementActive excavation of pit for future Aluminum Structural Plate (ALSP) Box Culvert looking upstream (west).  This project is located in Lewis Township, Union County.

 

Filed Under: Bassett Engineering News Tagged With: Culvert, Lewis Township, Replacement, Shuck Road, Union County

Photo of the day: Renovo Borough Boat Launch

January 12, 2018 By Bassett Engineering

Renovo Borough, Boat Launch

New asphalt pavement boat ramp at 5th Street boat launch.  Note lower concrete ramp portion visible just above ice flow line.

 

Filed Under: Bassett Engineering News Tagged With: Boat Launch, Renovo Borough

  • « Previous Page
  • 1
  • …
  • 10
  • 11
  • 12
  • 13
  • Next Page »

Quick Links

  • Buildings and Land Development
  • Wastewater
  • Nutrient Removal
  • Roads
  • Bridges and Culverts
  • Awards
  • Funding Assistance

Start A Project

If you’re ready to start a new project, or to request more information, call us.

Phone : 570-368-2131

Connect with Us

  • Facebook
  • LinkedIn

1440 Broad Street
Montoursville, PA 17754

Copyright © 2025 · Bassett Engineering, Inc. · site designed and powered by Xtego.